
| A. Use 3/4 Carbide Drill Bit B. Drill hole 5-1/2 inches deep |
C. Free the hole from all dusts allowing the penetration of the resin |
D. Fill the Hole with acrylic resin |
E. Insert sleeve | F. Take off plastic cap clean area attach the Marker Post with T-BAR |
| Instalation of the Self Adjusting Marker
Posts The importance of the five stages of installation is necessary for proper anchorage. The absence of the above steps may result in a week hold. A technical notice of installation an a schematic are furnished with each delivery |
||||


| Number | Product Description | Brand | Size | Type |
| 0920-Kit | Installation Kit | |||
| 0935-ST | Drill Bits Carbide | Red Head | 3/4" | Straight |
| 0935-SP | Drill Bits Carbide | Red Head | 3/4" | Spline |
| 0935-SD | Drill Bits Carbide | Red Head | 3/4" | SDS Plus |
| 0935-MX | Drill Bits Carbide | Red Head | 3/4" | SDS Max |
| 0935-AT | Drill Bits Carbide | Red Head | 3/4" | A-Taper |
| 0925-Wrench | Tool Wrench | Marker Posts | ||
| 0926-Sleeve | Sleeve | Metal | ||
| 0927-Pump | Pump | Air | ||
| 0928-E-Gun | Epoxy Gun | EPCON | Double Tube | |
| 0930-E-Glue | Glue | Epcon Resin | 29.9 fl. oz. | |
| 0934-E-Glue | Glue Nozzle | Self Mixing | Two Part resin |
|
|
|
|
|
|
New Century
NORTHWEST LLC