Self Erecting Marker Posts Installation
Marker Post
Installation Instructions for Marker Posts


A. Use 3/4 Carbide
Drill Bit B. Drill hole 5-1/2
inches deep
C. Free the hole
from all dusts
allowing the
penetration of
the resin
D. Fill the Hole
with acrylic resin
E. Insert sleeve F. Take off plastic
cap clean area
attach the Marker
Post with T-BAR
Instalation of the Self Adjusting Marker Posts
The importance of the five stages of installation
is necessary for proper anchorage.
The absence of the above steps may result in a week hold.
A technical notice of installation an a schematic are furnished with each delivery
Installation KitSelf Erecting Markers
Number Product Description Brand Size Type
0920-Kit Installation Kit
0935-ST Drill Bits Carbide Red Head 3/4" Straight
0935-SP Drill Bits Carbide Red Head 3/4" Spline
0935-SD Drill Bits Carbide Red Head 3/4" SDS Plus
0935-MX Drill Bits Carbide Red Head 3/4" SDS Max
0935-AT Drill Bits Carbide Red Head 3/4" A-Taper
0925-Wrench Tool Wrench Marker Posts
0926-Sleeve Sleeve Metal
0927-Pump Pump Air
0928-E-Gun Epoxy Gun EPCON Double Tube
0930-E-Glue Glue Epcon Resin 29.9 fl. oz.
0934-E-Glue Glue Nozzle Self Mixing Two Part resin


Self Erecting Marker Posts / Installation / Marker Post Colors

Hand Carry Marker Posts Crossguard Marker Posts
Traffic Cones Delineators Portable Delineators Pavement Markers
Plastic Speed Bumps Rubber Speed Bumps


Product List
Site Map
Quotations
Shipping
Terms

New Century NORTHWEST LLC
775 Vincent Street
Eugene, Oregon 97401
Phone: (541) 342-4500 Fax: (541) 485-5566
E-MAIL sales@ncnwest.com HOME PAGE